Description of the project: OL2K Projects
Infrastructure Early Site Preparation Works (Civil Site Preparation) - 03IN03-060 ( 2005 - 2006)
Utilities Civil 3 - 03UT02-056 ( 2006 - 2007)
Plant Civil Works for EBSM Project ( 2006 - 2007)
Utilities-M3 -03UT02-53 ( 2007 - 2008)
New EHS Building works - 03SCT06-3F001 ( 2006 - 2007)
Infrastructure Central Warehouse ( 2006 - 2007)
185934 - 03IN03 -3F003
Owner/Client: Equate / DOW-PIC/Fluor
Location: Equate Kuwait
Scope of Work: Early Site Preparation Works (C1), Plant Civil works for Utility Portion (C3), Plant Civil works for EBSM Plant (EBSM), General Construction of Tail and SRU plant and Flaring (M3), Construction of New EHS Building, Ware House Building and Miscellaneous Plant Civil and Mechanical works through site construction close out contract.
Infrastructure Early Site Preparation Works (Civil Site Preparation) Contract No.03IN03-060
Description of the project: Enhancement of Crude Export Facilities at South Tank Farm
Contract No. 26737 2005/2007
Owner/Client: KOC / TEKFEN
Location: KOC, South Tank Farm Kuwait
Scope of Work: Construction of 8 mega Tank foundations, bund walls, valve pits, asphalt protected dike walls and tank beam berms.
Construction of Substations & Control room buildings, pump house shelters, sewers, duct banks, drains & manholes, roads, asphalting & fencing
48” dia crude oil pipe lines of approximately 25 km, excavation upto 10 m depth etc.
Description of the project: KOC Contract No. 32757 Building New Gathering Centre - GC 24
Subcontract No. 32757-O00-1-001 - Shelter Erection works.
Subcontract No. 32757-O00-6-003 – Pipeline Works
Subcontract No. 32757-O00-6-007 - Incoming flow line piping & Tie-in works
Subcontract No. 32757-O00-2-002. - Civil works for 11 KV Route for New GC 24.
Owner/Client: KOC / S.K. Engineering & Construction Co.
Location: North Kuwait
Scope of Work: Shelter construction works composed of shelter foundation, pre fabricated structural shelter installation, Roof/wall cladding works, installation of louvers, installation of over head crane girders.
Construction of deep sump pits 16 mtr x 7 mtr x 13 mtr – 4 Nos.
Construction of RCC standby generator building and associated architectural works. Civil works for underground cable installation works
Construction of Pipeline, Tie-ins for these pipelines at various locations, Flow line Inlet Manifold Piping, In plant U/G Piping, Fire-Fighting and CO2 System Piping for Buildings and Painting Works
Civil works for 11 KV route for GC-24 including road crossing and duct banks.
Description of the project: Hire of heavy equipment for 5 years
Cont. # JO/SC46/MM00
Owner/Client: Joint Operations, Wafra
Location: Wafra Kuwait
Scope of Work: Supply of Equipment on casual hire basis at Wafra
Description of the project: KPPC Aromatics Complex project
Contract No. 3282-ZA-BW-SC0001
Owner/Client:KPPC / SKEC
Location: Equate Kuwait
Scope of Work: Civil and Architectural works involving over 23,000 m3 concrete for the substation, blast resistant building, shelter, vessel and heavy equipment foundation, paving, asphalt roads and Excavation for underground piping and trenches.
Description of the project: Tail Gas Treating Unit (TGTU)
Cont. # 9097N-100-CS-0000-02 & 9097N-100-CS-0000-03.
Owner/Client: Kuwait National Petroleum Co. / Technip
Location: KNPC, Shuaiba Refinery Kuwait
Scope of Work: Erection of Waste heat boiler 12 ft. x 16 ft. x 18 ft with a total weight of 105 tons together with Blow down tanks, sample coolers
Erection of Catalyst drum, catalyst daily drum, Sulphur Separation drum, drain drum, surge pot, active carbon filter, solvent recycle heat exchanger, Caustic tank etc.
Erection of tail gas incinerator with burners, combustion air duct work, inlet transition to boiler, Vertical stack – Mod 1, 2, 3 & 4, external shroud of Aluminium.
Erection of Solvent recycle pump, catalyst make pumps, organic phase pump, blow down pump, sulphur pump, water circulation pump, lift pump, caustic pump, motor driven fan, steam turbine fan, interconnecting air ducting, agitator in catalyst drum.
Erection of internal distribution arrangement, saddle packing, active carbon, active carbon filter, alumina balls etc for reactor.
Erection tempered Water air cooler.
Erection of piping system
Fire proofing works
Fabrication, Erection, Painting and testing of tanks.
Civil & Structural works.
Description of the project: Reconstruction project of KNPC - MAA Refinery
Owner/Client: KNPC / Fluor-SK Consortium
Location: MAA Refinery Kuwait
Scope of Work: Construction of Central Control Room 1 & 2 comprising of buildings, heavy foundations for heaters, boilers, operator shelters, Substation Buildings M74A & M74B and associated constructions.
Description of the project: Improvement in fire fighting facilities at Sabhan & Ahmadi Depots
Cont. # HO/FPPD/4001
Owner/Client: KNPC
Location: Ahmadi & Sabhan Depot Kuwait
Scope of Work: EPC for Field Erected Tanks -Civil, Mechanical, Piping, Tank Fabrication, Electrical &, Instrumentation & CP works.
Description of the project: New Gas Oil De-sulphurization Project Cont. # CA/2940
Owner/Client: KNPC – LG Engg & Const.
Location: KNPC MAA Refinery Kuwait
Scope of Work: Complete civil & building works including Electrical, HVAC & Asphalting works
Description of the project: Construction of office and workshop facilities
Owner/Client: Mohd. Naser Al-Baddah & Sons Co.
Location:Shuaiba Industrial Area Kuwait
Scope of Work: Design, Engineering, Procurement & construction of multistoried office building, Kirby type workshop & plant building complete with electrical, HVAC, fire fighting plumbing and sanitary works, asphalting etc.