OL2K Projects - ( 2005 / 06 )

Description of the project: OL2K Projects
Infrastructure Early Site Preparation Works (Civil Site Preparation) - 03IN03-060 ( 2005 - 2006)
Utilities Civil 3 - 03UT02-056 ( 2006 - 2007)
Plant Civil Works for EBSM Project ( 2006 - 2007)
Utilities-M3 -03UT02-53 ( 2007 - 2008)
New EHS Building works - 03SCT06-3F001 ( 2006 - 2007)
Infrastructure Central Warehouse ( 2006 - 2007)
185934 - 03IN03 -3F003

Owner/Client: Equate / DOW-PIC/Fluor

Location: Equate Kuwait

Scope of Work: Early Site Preparation Works (C1), Plant Civil works for Utility Portion (C3), Plant Civil works for EBSM Plant (EBSM), General Construction of Tail and SRU plant and Flaring (M3), Construction of New EHS Building, Ware House Building and Miscellaneous Plant Civil and Mechanical works through site construction close out contract.


Infrastructure Early Site Preparation Works (Civil Site Preparation) Contract No.03IN03-060

  • Early site preparation works
  • Grading and removal of top vegetation
  • Excavation, backfilling and compaction
  • Demolition of existing roads and buildings.
  • Construction of new roads & buildings.
  • Installation of Lighting Poles & Light Fixtures
  • Removal of existing fence and installation of new.
  • New Access Control System.


Utilities Civil 3 - Contract No.03UT02-056

Utility Area: Civil works for Pipe rack - Steam / Condensate / BFW lines. Foundation for Boilers. Foundation for Finger Racks. Foundation for Sub Pipe Racks. Other foundations - Boiler Area. Foundation for BFW Pumps.

  • Foundation for other Pumps. 15m RC Concrete ring foundation for Condensate Tank. RC Concrete foundation for Chemical Dosing Skid (Size 10x10) RC Mat foundation for Cooling Water Pump - Tank Area.

SCT Area: Survey and setting out. Dewatering. Shoring / Strutting. Excavation for Pipeline Trenches. Excavation for Valve Chambers and Sea outfall discharge chamber. Form work and re-bar works for Chambers. Concrete pouring, curing and protective coating for chambers. Road crossing works in multi phases. Traffic diversion. Backfilling and compaction. Asphalt re-Installation of Road Crossings.

  • Carbon Steel and FRP piping works & Electrical works.
  • Construction of substation building


Plant Civil Works for EBSM Project Cont.No.02ST01-032

  • Civil, foundation works, Substation building including HVAC, Structural Steel, CS / FRP underground Piping, Electrical Works
  • Vessel insulation and pre dressing for vessels.


Utilities-M3 - Cont No-03UT02-53

  • Civil Works
  • Mechanical Works
  • Piping Works
  • Structural Works
  • Electrical And Instrumentation Works
  • Insulation Works


New EHS Building works - Cont# 03SCT06-3F001

Construction New HS&E 2 Storey building including HVAC & Electrical works of size 27mx21m and relocation of 19mx16.5 Fire Truck house


Cont # 185934-03IN03-3F003 - Infrastructure Central Warehouse

  • Construction of 50m x 22 m Size Central Warehouse Building with pre-engineered structure and 20mx6m office with all RC paving and internal finishing, Construction of Generator Shelter and external roads

Enhancement of Crude Export Facilities at South Tank Farm Contract No. 26737 - ( 2005 / 07 )

Description of the project: Enhancement of Crude Export Facilities at South Tank Farm Contract No. 26737 2005/2007

Owner/Client: KOC / TEKFEN

Location: KOC, South Tank Farm Kuwait

Scope of Work: Construction of 8 mega Tank foundations, bund walls, valve pits, asphalt protected dike walls and tank beam berms.
Construction of Substations & Control room buildings, pump house shelters, sewers, duct banks, drains & manholes, roads, asphalting & fencing
48” dia crude oil pipe lines of approximately 25 km, excavation upto 10 m depth etc.

KOC Contract No. 32757 Building New Gathering Centre - GC 24 - ( 2007/ 10 )

Description of the project: KOC Contract No. 32757 Building New Gathering Centre - GC 24

Subcontract No. 32757-O00-1-001 - Shelter Erection works.

Subcontract No. 32757-O00-6-003 – Pipeline Works

Subcontract No. 32757-O00-6-007 - Incoming flow line piping & Tie-in works

Subcontract No. 32757-O00-2-002. - Civil works for 11 KV Route for New GC 24.

Owner/Client: KOC / S.K. Engineering & Construction Co.

Location: North Kuwait

Scope of Work: Shelter construction works composed of shelter foundation, pre fabricated structural shelter installation, Roof/wall cladding works, installation of louvers, installation of over head crane girders.

Construction of deep sump pits 16 mtr x 7 mtr x 13 mtr – 4 Nos.

Construction of RCC standby generator building and associated architectural works. Civil works for underground cable installation works

Construction of Pipeline, Tie-ins for these pipelines at various locations, Flow line Inlet Manifold Piping, In plant U/G Piping, Fire-Fighting and CO2 System Piping for Buildings and Painting Works

Civil works for 11 KV route for GC-24 including road crossing and duct banks.

Hire of heavy equipment for 5 years Cont. # JO/SC46/MM00 - ( 2001-06 )

Description of the project: Hire of heavy equipment for 5 years Cont. # JO/SC46/MM00

Owner/Client: Joint Operations, Wafra

Location: Wafra Kuwait

Scope of Work: Supply of Equipment on casual hire basis at Wafra

KPPC Aromatics Complex project Contract No. 3282-ZA-BW-SC0001 - ( 2006 / 09 )

Description of the project: KPPC Aromatics Complex project Contract No. 3282-ZA-BW-SC0001

Owner/Client:KPPC / SKEC

Location: Equate Kuwait

Scope of Work: Civil and Architectural works involving over 23,000 m3 concrete for the substation, blast resistant building, shelter, vessel and heavy equipment foundation, paving, asphalt roads and Excavation for underground piping and trenches.

Tail Gas Treating Unit (TGTU) Cont. # 9097N-100-CS-0000-02 & 9097N-100-CS-0000-03. - 2004 / 06

Description of the project: Tail Gas Treating Unit (TGTU) Cont. # 9097N-100-CS-0000-02 & 9097N-100-CS-0000-03.

Owner/Client: Kuwait National Petroleum Co. / Technip

Location: KNPC, Shuaiba Refinery Kuwait

Scope of Work: Erection of Waste heat boiler 12 ft. x 16 ft. x 18 ft with a total weight of 105 tons together with Blow down tanks, sample coolers

Erection of Catalyst drum, catalyst daily drum, Sulphur Separation drum, drain drum, surge pot, active carbon filter, solvent recycle heat exchanger, Caustic tank etc.

Erection of tail gas incinerator with burners, combustion air duct work, inlet transition to boiler, Vertical stack – Mod 1, 2, 3 & 4, external shroud of Aluminium.

Erection of Solvent recycle pump, catalyst make pumps, organic phase pump, blow down pump, sulphur pump, water circulation pump, lift pump, caustic pump, motor driven fan, steam turbine fan, interconnecting air ducting, agitator in catalyst drum.

Erection of internal distribution arrangement, saddle packing, active carbon, active carbon filter, alumina balls etc for reactor.

Erection tempered Water air cooler.

Erection of piping system

Fire proofing works

Fabrication, Erection, Painting and testing of tanks.

Civil & Structural works.

Reconstruction project of KNPC - MAA Refinery - ( 2001 / 2003 )

Description of the project: Reconstruction project of KNPC - MAA Refinery

Owner/Client: KNPC / Fluor-SK Consortium

Location: MAA Refinery Kuwait

Scope of Work: Construction of Central Control Room 1 & 2 comprising of buildings, heavy foundations for heaters, boilers, operator shelters, Substation Buildings M74A & M74B and associated constructions.

Improvement in fire fighting facilities at Sabhan & Ahmadi Depots Cont. # HO/FPPD/4001 - ( 2008 / 10 )

Description of the project: Improvement in fire fighting facilities at Sabhan & Ahmadi Depots Cont. # HO/FPPD/4001

Owner/Client: KNPC

Location: Ahmadi & Sabhan Depot Kuwait

Scope of Work: EPC for Field Erected Tanks -Civil, Mechanical, Piping, Tank Fabrication, Electrical &, Instrumentation & CP works.

New Gas Oil De-sulphurization Project Cont. # CA/2940 - ( 2000 / 01

Description of the project: New Gas Oil De-sulphurization Project Cont. # CA/2940

Owner/Client: KNPC – LG Engg & Const.

Location: KNPC MAA Refinery Kuwait

Scope of Work: Complete civil & building works including Electrical, HVAC & Asphalting works

Construction of office and workshop facilities - ( 2001 / 02

Description of the project: Construction of office and workshop facilities

Owner/Client: Mohd. Naser Al-Baddah & Sons Co.

Location:Shuaiba Industrial Area Kuwait

Scope of Work: Design, Engineering, Procurement & construction of multistoried office building, Kirby type workshop & plant building complete with electrical, HVAC, fire fighting plumbing and sanitary works, asphalting etc.